We wanted to let you know how we use cookies on our site. Click Here to view our full cookie policy.We use cookies to enhance your site experience and for functionality. By continuing to use this site you consent to our use of cookies.
Categories

New Towers

Marley Field Erected Tower Parts

Parts Warehouse

Repair & Reconstruction

Price & Design

Rental Towers

Company Info

Free Tools


Budget Bid Request
Cooling Tower Depot Budget Bid Request Form
* indicates required fields
Name*
Title
Company*
Address*
City*
State*
Country
          
Zip Code*
Phone*
Fax
Email*
Project Name/No.
Project Location*

Thermal design characteristics:
English Metric Units*
Flow Rate*
Hot Water Temp*
Cold Water Temp*
Inlet Wet Bulb*
Dry Bulb Temp
Site Altitude
          
Structural design specifics:
Preferred number of cells, if any
Maximum allowable BHP per cell
Maximum allowable plot size:
length  width  height
Basin Depth (feet):

Type of cooling tower preferred: *
Counterflow
Crossflow
No preference
 
Type of fill requested: *
Film Fill
Splash Fill
Non-Fouling Film Fill
No preference
 
Construction labor requirements:
Union
Non-Union
Site Labor Agreement
 
Supply line voltage:
460
4160
          
Makeup water source:
City Water
Grey Water
River Water
Sea Water
 
Type of structure preferred:
Douglas Fir
Fiberglass
Concrete (internals & mechanicals only)
 
Special noise requirements other than OSHA:
Yes
No
 
If yes, please explain:

Scope of Supply:

Structure, stainless steel connecting hardware, fill, drift eliminators, fan deck, windwalls, casing, partitions, header with lateral distribution system, composite drive shaft, gear box, vibration cut out switch, high efficiency fan, FRP fan stacks, high efficiency motor, mechanical equipment support, escape ladder, stair tower, freight to job site, installation labor and accessories as requested.

Design drift loss is 0.005%.

All designs meet Uniform Building Code (1997) and Cooling Tower Institute Standards.

Accessories Required:

Fire protection
Lightning protection
Performance test

Delivery:
Required delivery date
Required completion date

Shipping terms required:
FOB Jobsite
FOB Port of
FAS US Port

Additional Requirements if any: